COMMUNITY DRINKING WATER · WATER ATMS

Solar water kiosks in Odisha

Suitable for community water points, public facilities and campuses. Scope: source-tested treatment, solar power, storage and dispensing scope. Brief: source-water tests, daily demand, site and proposed operator. Next step: request a duty assessment; photos certify neither output nor potable-water quality.

  • Source water testing
  • Treatment and storage
  • Solar canopy
HELLOCON solar water kiosk with canopy and dispensing taps
HELLOCON solar-powered community water kiosk
Solar panel canopy over the storage tank of a HELLOCON water kiosk

THE SOLUTION

System design: Solar water kiosks

A solar water kiosk combines power generation with an equipment enclosure, water storage and dispensing points. HELLOCON plans these community water-access systems in Odisha around source-water testing, the treatment process, energy demand and servicing. The photographs on this page show HELLOCON installations; treatment performance must be established for the actual site.

  • Bring water-access equipment into a coordinated installation
  • Match treatment to source-water conditions
  • Plan ongoing operation and maintenance from the start
HELLOCON solar water kiosk with canopy and dispensing taps

Solar water kiosk installation by HELLOCON. Confirm the site's pumping duty, source-water and treatment tests, and operator responsibilities before use.

Components illustrated in this system

  1. Solar canopy and electrical equipment
  2. Site-specific treatment train
  3. Storage tank and pipework
  4. Dispensing enclosure and taps

01 · THE DESIGN BRIEF

Solar water kiosks: applications and equipment

  • APPLICATIONS

    Where it works

    • Community drinking-water points
    • Public facilities and campuses
    • Rural and institutional water access
  • SYSTEM ARCHITECTURE

    What it brings together

    • Solar canopy and electrical equipment
    • Site-specific treatment train
    • Storage tank and pipework
    • Dispensing enclosure and taps
    • Monitoring and service access
  • ENGINEERING

    What we assess

    • Raw-water test results and required treatment
    • Daily demand and peak dispensing use
    • Hygiene, consumables, maintenance and power duty

Final configuration, component standards, test documents and warranty terms are confirmed in the project-specific proposal and technical documentation.

Solar panel canopy over the storage tank of a HELLOCON water kiosk

Solar canopy over the storage tank of a HELLOCON community water kiosk. The canopy supplies energy; this photograph certifies neither drinking-water quality nor discharge. Confirm source testing, treatment duty and ongoing hygiene and maintenance responsibilities.

02 · FROM BRIEF TO OPERATION

From survey to commissioning: Solar water kiosks

  1. Step 1: Discover

    Understand the site, the load and your energy goals.

  2. Step 2: Engineer

    Assess shading, system configuration and electrical integration.

  3. Step 3: Deliver

    Coordinate procurement, site execution and installation.

  4. Step 4: Commission

    Test, document and bring the system into service.

  5. Step 5: Support

    Maintain performance through operation and maintenance.

03 · USEFUL TO KNOW

Water kiosks and water ATMs: frequently asked questions

Does a solar canopy make the water safe to drink?

No. Solar supplies energy. Water suitability depends on source testing, appropriate treatment, hygienic operation and ongoing verification.

What treatment capacity is available?

Capacity is selected from daily demand, source-water results and the proposed treatment process. Request a site-specific proposal and equipment datasheets.

What is a solar water kiosk or water ATM?

A community water point that combines a solar canopy, an equipment enclosure with a site-specific treatment train, a storage tank and dispensing taps.

Is the source water tested before treatment is selected?

Yes. Raw-water test results decide the treatment process, alongside daily demand and peak dispensing use.

Who looks after the kiosk day to day?

Operating and maintenance responsibilities, consumables, hygiene checks and service access are agreed in the proposal before installation. See operation and maintenance.

PLAN YOUR COMMUNITY WATER PROJECT

Request a water kiosk proposal

Share your location and the project brief. We will confirm the equipment and scope that suit your site.

SEND AN ENQUIRY

Choose your requirement and share your name, mobile number and location. Other details are optional; no documents or payment are needed to begin.

What would you like to discuss?
No payment or sensitive documents required.
CallEmail

Our team reviews enquiries during office hours. Callback, survey and service-visit timing are confirmed separately.

NEXT STEP

Plan a community drinking water kiosk for your village or school

Share the raw-water test results if available, expected daily demand and the site location. Treatment and capacity are selected from those details.

Every day, 9:00 am to 6:00 pmHead office: Bhubaneswar (opens Google Maps in a new tab) · Serving all 30 districts of Odisha

WHATSAPP ENQUIRY

Start a WhatsApp enquiry

Share three quick details to start your WhatsApp conversation.

These details will be included in your message draft. Press Send in WhatsApp to send it to our team.