SOLAR + GRID + LiFePO₄ STORAGE

Hybrid solar with battery backup in Odisha

Suitable for homes, businesses and institutions with defined backup needs. Scope: solar, grid and compatible storage for selected supported circuits. Brief: bills, essential loads, outage duration, connection and site details. Next step: request a backup assessment; runtime depends on load and usable storage.

  • Solar + grid + battery
  • Essential-load backup
  • LiFePO₄ storage
Rooftop solar panels beside an inverter and battery storage cabinet

THE SOLUTION

System design: Hybrid solar systems

Hybrid solar brings photovoltaic generation, a utility connection and Lithium Ferro Phosphate (LiFePO₄) battery storage into a coordinated design. HELLOCON plans these systems in Odisha around self-consumption and the agreed backup loads. Supported circuits, inverter capability, isolation and utility approval determine how the system operates during an outage.

  • Coordinate solar use with storage
  • Plan backup for specifically selected circuits
  • Specify LiFePO₄ battery capacity from a documented load brief
Illustration of LiFePO4 battery storage with a hybrid inverter

Components illustrated in this system

  1. Photovoltaic array
  2. Compatible hybrid inverter
  3. Lithium Ferro Phosphate (LiFePO₄) battery pack and BMS
  4. Essential-load distribution

01 · THE DESIGN BRIEF

Hybrid solar systems: applications and equipment

  • APPLICATIONS

    Where it works

    • Homes with essential backup loads
    • Offices and commercial premises
    • Institutions with a defined continuity requirement
  • SYSTEM ARCHITECTURE

    What it brings together

    • Photovoltaic array
    • Compatible hybrid inverter
    • Lithium Ferro Phosphate (LiFePO₄) battery pack and BMS
    • Essential-load distribution
    • Grid interface, isolation and protection
  • ENGINEERING

    What we assess

    • Essential circuits and starting currents
    • Usable storage and recharge schedule
    • Inverter modes, utility permissions and electrical isolation

Final configuration, component standards, test documents and warranty terms are confirmed in the project-specific proposal and technical documentation.

02 · FROM BRIEF TO OPERATION

From survey to commissioning: Hybrid solar systems

  1. Step 1: Discover

    Understand the site, the load and your energy goals.

  2. Step 2: Engineer

    Assess shading, system configuration and electrical integration.

  3. Step 3: Deliver

    Coordinate procurement, site execution and installation.

  4. Step 4: Commission

    Test, document and bring the system into service.

  5. Step 5: Support

    Maintain performance through operation and maintenance.

USEFUL TO KNOW

Hybrid solar systems: frequently asked questions

Does every hybrid inverter power the whole building during a blackout?

No. Backup depends on equipment capabilities, LiFePO₄ battery state, connected loads and the approved electrical arrangement. Essential circuits must be identified during design.

Is LiFePO₄ battery storage automatically covered by rooftop subsidy?

Do not assume that every storage component qualifies. Current residential scheme rules, installation configuration and DISCOM verification determine eligibility; confirm before purchase.

Which loads can a hybrid solar system back up?

Only the circuits selected during design. Essential loads, starting currents, usable LiFePO₄ storage and the inverter’s capability decide what runs during an outage, so list the appliances you need before the survey.

PLAN YOUR SOLAR POWER PROJECT

Request a hybrid solar backup assessment

Share your location and the project brief. We will confirm the equipment and scope that suit your site.

SEND AN ENQUIRY

Choose your requirement and share your name, mobile number and location. Other details are optional; no documents or payment are needed to begin.

What would you like to discuss?
No payment or sensitive documents required.
CallEmail

Our team reviews enquiries during office hours. Callback, survey and service-visit timing are confirmed separately.

NEXT STEP

Plan a hybrid solar system with battery backup

List the essential circuits and appliances you need during a power cut. We assess storage, inverter capability and utility permissions before proposing a design.

Every day, 9:00 am to 6:00 pmHead office: Bhubaneswar (opens Google Maps in a new tab) · Serving all 30 districts of Odisha

WHATSAPP ENQUIRY

Start a WhatsApp enquiry

Share three quick details to start your WhatsApp conversation.

These details will be included in your message draft. Press Send in WhatsApp to send it to our team.