A local 3 kW installation in Binjharpur
HELLOCON has completed a 3 kW residential PM Surya Ghar installation in Binjharpur. The owner confirmed this project’s location, capacity and residential use. Binjharpur is part of Jajpur district, as listed in the Jajpur district administration’s tahasil directory.

View the Binjharpur project profile and photographs. A neighbouring installation can help you understand the equipment and roof arrangement. Your own capacity should follow a survey and your household’s consumption rather than copying another home’s system.
What to prepare for your Jajpur site survey
Share your village or town, a recent electricity bill and clear photographs of the roof and access route. The survey assesses shade from nearby buildings and trees, usable roof space, structure, drainage and the route between panels and electrical equipment. Roof condition, wind exposure and secure mounting matter alongside the module and inverter selection.
The proposal should identify the equipment, protection devices, installation work, connection support, warranty documents and maintenance responsibilities. Ask which roof or electrical repairs are outside the quoted scope. Read our roof preparation guide and residential solar service page before the visit.
PM Surya Ghar application and utility coordination
For scheme assistance, use the official PM Surya Ghar portal. Select the state, district and electricity distribution company shown on your bill. Check the registered vendor listing for your application before entering an agreement. Installation, inspection, metering and assistance follow the applicable portal and utility process.
HELLOCON’s PM Surya Ghar Odisha guide explains the journey and documents. A project photograph or capacity does not establish subsidy eligibility, approval or household savings. Those depend on the application’s conditions and actual operation.
Survey arrangements and support
Our main office is in Hanspal, Bhubaneswar. Contact the team with your Jajpur location to arrange a survey and confirm travel and scheduling. After installation, keep the equipment schedule, test records, warranty details and utility documents together; they help the service team identify the system and respond to maintenance enquiries.
01Do you have a project in Jajpur district?
Yes. The Binjharpur project is a HELLOCON 3 kW residential PM Surya Ghar installation shown in our project gallery.
02Will my home also need 3 kW?
Not necessarily. Monthly consumption, roof space, shading and connection conditions determine the proposed capacity.
03Is there a HELLOCON office at this project location?
The Binjharpur page describes an installation. Contact our Hanspal, Bhubaneswar office to arrange a Jajpur survey.
04What should I send to request a visit?
Send your village or town, electricity bill and roof photographs. The team will confirm the survey arrangements with you.
05Where do I check scheme eligibility and vendors?
Use the official PM Surya Ghar portal for your state, district and electricity distribution company.
06What maintenance information should I retain?
Keep the installed equipment schedule, commissioning records, warranty documents and service contact details.