A Jajpur home at night under a starfield; lit windows glow below the rooftop array.
RESIDENTIAL · PM SURYA GHAR
3 kW rooftop solar in Jajpur: array beside the house
A HELLOCON residential rooftop solar installation under PM Surya Ghar, with the array beside an existing rooftop building.
- 3 kW
- PM Surya Ghar
- Jajpur
Project facts
- Location
- Jajpur district, Odisha
- System capacity
- 3 kW
- Application
- Residential rooftop solar
- Programme
- PM Surya Ghar

01 Site record
A rooftop array beside the house in Jajpur
The photograph records the module rows close to an existing rooftop building, with vegetation around the home. It shows how available roof space and surrounding features need to be considered together. A similar system should be surveyed for usable area and changing shade, with access and the electrical route agreed before installation. The installed capacity is 3 kW; it does not determine the capacity another household needs.
02 Scope
The installation
The homeowner’s roof provides space for a 3 kW solar installation. The photograph on this page shows the rooftop photovoltaic installation. Solar panels, mounting and electrical integration work together as a complete system; their final arrangement follows the conditions at each home.
A project of this size should be assessed against the household’s electricity use, roof space, shading and connection requirements. The same rated capacity can produce different results at different sites.
Explore the Jajpur rooftop solar guide and local installations.
03 Your home
Planning a similar rooftop system
Start with a recent electricity bill and an assessment of the roof. Read our residential rooftop solar guide for the survey, equipment and installation process, and the PM Surya Ghar Odisha guide for the official application journey. Subsidy eligibility, approved vendor selection, inspection and metering are decided through the relevant government and DISCOM process.
Before agreeing a proposal, compare the equipment schedule, warranty terms, installation scope and maintenance responsibilities. A quotation should explain the roof arrangement, electrical protections, connection process and any work excluded from the quoted scope.
Frequently asked questions
What should a similar roof survey examine?
Usable roof space, the adjacent building, surrounding shade, safe access and the route to electrical equipment should all be included in the actual site brief.
Does a 3 kW system guarantee a zero bill?
No. Generation, household consumption, shading, weather and DISCOM charges affect the bill. Installed capacity alone cannot establish savings.
Can I use this project as a subsidy approval guarantee?
No. Each household follows the official application and eligibility process. A completed installation at another home does not guarantee approval or payment.
How do I plan a similar installation?
Request a site assessment with your location, recent electricity bill and roof details. The proposed capacity and equipment should follow your own site’s requirements.
A 3 kW PM Surya Ghar rooftop solar installation by HELLOCON.